| ||||||||||||
| ||||||||||||
| M03 | ||||||||||||
| Installation diagram (M03) Focus B or C, using A-cement 1 Focus B or C. Focus C: Visible edges should be painted 2 Connect A-cement 0044, diameter 40 mm 3 Focus C: Connect Splines 0219, L=150 mm 4 For installation of floating ceilings: Connect Wood trim 2561, L=2500 Min. overall depth of system: 23 mm Min. demounting depth: The system is non-demountable Download
| ||||||||||||