installation diagrams
 
αw
WMF WMF
DXF DXF
DWG DWG
EPS EPS
Printable version Printable version
M109
Installation diagram (M109) for Focus C, direct installation
1 Connect Z-profile 0227, installed at 600 mm centres
2 Connect Direct fixing plate 0214 (installed at 1200 mm centres)
3 Connect Splice Connector Z 0501
4 Connect Spline 0219, L=150 mm
5 Connect T-spline 0011, L=600 mm. To comply with fire class "Tändskyddande beklädnad"
6 Connect Angle trim, fixed at 300 mm centres
7 Connect Shadow-line trim, fixed at 300 mm centres
8 For installation of floating ceilings: Connect Channel trim 0623
Min. overall depth of system: 35 mm
Min. demounting depth: Individual ceiling tiles are non-demountable

Download
WMF M109.WMF (480kB)
DXF M109.DXF (2768kB)
DWG M109.DWG (1524kB)
EPS M109.EPS (528kB)