| ||||||||||||
| ||||||||||||
| M111 | ||||||||||||
| Installation diagram (M111) for Master C, direct installation 1 Connect Z-profile 0227, installed at 600 mm centres 2 Connect Direct fixing plate 0214, installed at 1200 mm centres 3 Connect Splice Connector Z 0501 4 Connect Spline 0219, L=150 mm 5 Connect T-spline 0011, L=600 mm. To comply with fire class "Tändskyddande beklädnad" 6 Connect Angle trim, fixed at 300 mm centres 7 Connect Shadow-line trim, fixed at 300 mm centres 8 For installation of floating ceilings: Connect Channel trim 0623 Min. overall depth of system: 55 mm Min. demounting depth: Individual ceiling tiles are non-demountable Download
| ||||||||||||