| ||||||||||||
| ||||||||||||
| M240 | ||||||||||||
| Installation diagram (M240) for Ecophon Super G Dp XL corridors 1 Connect Modular Wall trim 0733 2 Connect T24 Corridor profile 3 Connect Absorber distance 0025 4 Connect Edge cover Dp 0732 / Cover trim Dp/Dg 0732 5 Connect Panel lock Dp 0218 (for class 2A) 6 Connect Impact bracing Dp 0240 (for class 2A) 7 Connect Wall spring spacer 0087 8 Connect Channel trim 0532 Min. overall depth of system: 65 mm Min. demounting depth: 20 mm Download
| ||||||||||||